Demolition Phase - 28th November 2006

The removal of the previous office partitions has been completed and restoration of the brickwork is well underway.

Return to the details about our new studio

All Brickwork has been stripped back - Studio 2
All Brickwork has been stripped back - "Studio 2"

More stripped back brickwork - Studio 1
More stripped back brickwork - "Studio 1"

Sue surveys the damage
Sue surveys the damage

The full length of the building from Reception
The full length of the building from "Reception"

Close up of the stripped brick work
Close up of the stripped brick work

Return to the details about our new studio