Decoration Phase - 28th January 2007

All the reconstruction work is complete, Now the decoration and fitting out is in full swing.

Return to the details about our new studio


Breakout room for 'studio 1'. Currently storing the skirting boards.


'Studio 2' Discussion room.


Conference Room, including parts yet to be fitted into the Kitchen.


Corridor to the far end of the Building. 'Studio 1' Breakout room ahead, 'Studio 2' Breakout room to the Left, and Client toilets to the Right.


'Studio 1' Viewing room, through the soon to be installed mirror into the Discussion room.


Corridor from Reception, with 'Studio 1' to the Left and 'Studio 2' to the Right.


'Studio 2' Viewing room, through the soon to be installed mirror into the Discussion room. 'Studio 1' through the doors.


Corridor towards Reception, with 'Studio 1' to the Right and 'Studio 2' to the Left.


The Kitchen now has most units, work surface, and appliances fitted.

Return to the details about our new studio